Sharma Case Study

Delivering 2,600 Fiber Optic Splicing and Testing Points

IC's expert team delivered mission-critical fiber optic projects for Sharma FO, on time, and at scale.

Project Overview

Sharma FO is an infrastructure-focused organization operating in a critical and time-sensitive environment, where network readiness and reliability are essential to the success of the overall project.

Due to internal resource limitations, the client did not have the required specialized team to complete approximately 2,600 fiber optic splicing and testing points within the tight delivery window.

With strict deadlines and zero tolerance for delays, the project required a partner capable of executing high-volume fiber work quickly, accurately, and with certified testing results.

ClientSharma FO
IndustryTelecommunications / Infrastructure
Project TypeFiber Optic Splicing & Testing (Fluke Certified)
Project Duration15 Days
Pain Points

The Problems They Faced

Lack of Specialized Manpower

The client did not have a qualified internal team capable of handling approximately 2,600 fiber splicing and testing points.

High Accuracy & Testing Requirements

All fiber connections required proper testing and validation, with reliable results to meet technical and operational standards.

Critical Timeline Constraints

The project was located in a high-priority, sensitive area, leaving no room for delays or rework.

Our Process

IC's Intervention

IC mobilized a well-trained fiber optic team equipped to execute high-volume work at speed.

Step 1

High-Level Team Preparation

  • - Mobilized a well-trained, highly experienced fiber optic team
  • - Equipped the team with certified tools and testing devices to operate at scale from day one
Step 2

Operational Optimization

  • - Implemented a double-shift working model
  • - Maximized productivity while maintaining quality and safety standards
Step 3

Splicing & Fluke Testing Execution

  • - Completed fiber optic splicing across all required points
  • - Conducted Fluke testing to validate performance and signal integrity
  • - Ensured clean documentation and acceptance-ready results
Business Impact

The Impact We Made

  • ~2,600 fiber splicing and testing points completed.
  • High-quality testing results with no reported failures.
  • 100% on-time delivery within a 15-day timeframe.
  • Zero delays in the client's downstream project dependencies.
Business impact results